PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Metal Deck angles at Elev. 4,5 (3rd Floor) Facing East (800x600).jpg Metal Deck angles at Elev. 4-Stair -2 (3rd Floor) Facing South (800x600).jpg Metal Deck angles at Elev. 4-Stair -4 Facing South (800x600).jpg Bolted Column at Derrick -2 Facing South-East (800x600).jpg Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North-East (800x600).jpg
Previous page Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North-East (800x600)
Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North-East (800x600)